**QA Environment**
Home > Notice of Letting > Contract Detail

September 20, 2019 Letting 10:00 AM
032-68E16

Bulletin Description

CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES.
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 NHPP-STPU1BG(201)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Peoria
  • Tazewell
  • VARIOUS
  • D4 CULVERT LINING 2019
  • C-94-050-18
  • 4-00103-1901
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of September 10, 2019 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
59300100 CU YD CONTROLLED LOW-STRENGTH MATERIAL Base items 14.000
67100100 L SUM MOBILIZATION Base items 1.000
70100310 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100700 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 Base items 1.000
X0326659 FOOT CURED-IN-PLACE PIPE LINER, 18" Base items 225.000
X0326662 FOOT CURED-IN-PLACE PIPE LINER, 24" Base items 70.000
X0326663 FOOT CURED-IN-PLACE PIPE LINER, 30" Base items 184.000
X0326665 FOOT CURED-IN-PLACE PIPE LINER, 42" Base items 432.000
X0327789 FOOT CURED-IN-PLACE PIPE LINER, 60" Base items 210.000
X1200232 FOOT CURED-IN-PLACE PIPE LINER, 66" Base items 150.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.