**QA Environment**
Home > Notice of Letting > Contract Detail

September 20, 2019 Letting 10:00 AM
009-61F96

Bulletin Description

Construction of Poplar Creek Trail from east of the intersection of Shoe Factory Road and the CN Railroad to west of the intersection of IL Route 59. Project is located within the Forest Preserve of Cook County Arthur Janura Forest Preserve in the Village of Hoffman Estates.
Region District DBE % VBP % Federal Project #
1 1 4.00 0.00 9SF0(313)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Cook
  • POPLAR
  • CREEK
  • TRAIL
  • 13-00091-00-BT HOFFMAN ESTATES
  • C-91-287-13
  • 0-01730-1014
Contract Specifics
30 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of September 10, 2019 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20101000 FOOT TEMPORARY FENCE Base items 200.000
20101200 EACH TREE ROOT PRUNING Base items 5.000
20101300 EACH TREE PRUNING (1 TO 10 INCH DIAMETER) Base items 3.000
20101350 EACH TREE PRUNING (OVER 10 INCH DIAMETER) Base items 2.000
20200100 CU YD EARTH EXCAVATION Base items 277.000
20201200 CU YD REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL Base items 509.000
20400800 CU YD FURNISHED EXCAVATION Base items 294.000
21101505 CU YD TOPSOIL EXCAVATION AND PLACEMENT Base items 659.000
25000115 ACRE SEEDING, CLASS 1B Base items 0.500
25000210 ACRE SEEDING, CLASS 2A Base items 0.020
25000310 ACRE SEEDING, CLASS 4 Base items 2.250
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 46.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 46.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 311.000
28000305 FOOT TEMPORARY DITCH CHECKS Base items 30.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 8,232.000
28001100 SQ YD TEMPORARY EROSION CONTROL BLANKET Base items 13,409.000
30300001 CU YD AGGREGATE SUBGRADE IMPROVEMENT Base items 62.000
35102100 SQ YD AGGREGATE BASE COURSE, TYPE B 9" Base items 3,698.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 8,321.000
40603335 TON HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 Base items 622.000
67100100 L SUM MOBILIZATION Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
78001100 SQ FT PAINT PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 42.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 3,323.000
X0321322 EACH DROP GATE Base items 2.000
X0324097 SQ YD COARSE SAND PLACEMENT, 2" Base items 827.000
X0350810 EACH BOLLARD REMOVAL Base items 1.000
X2501820 ACRE SEEDING, CLASS 5 (MODIFIED) Base items 0.250
X2502014 ACRE SEEDING, CLASS 4A (MODIFIED) Base items 0.250
X2511630 SQ YD EROSION CONTROL BLANKET (SPECIAL) Base items 13,680.000
Z0013797 SQ YD STABILIZED CONSTRUCTION ENTRANCE Base items 155.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 52.000
No More Pay Items