November 18, 2022 Letting 12:00 PM
033-72119

Bulletin Description

Tree removal on IL 104 from 0.1 miles northwest of Waverly Lake Road / Gordon Hill Road to 0.2 miles east of Woods Creek.
Region District DBE % VBP % Federal Project #
4 6 0.00 0.00 STPYZUI(431)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Morgan
  • FAP 753
  • IL 104
  • 128TR
  • C-96-059-23
  • 6-01108-0300
Contract Specifics
Completion Date: March 31, 2023
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of November 08, 2022 04:30 PM.

  • Can trees be burned near the proposed ROW line and any stumps remaining be buried at the burn location?
    There is NO TREE STUMP REMOVAL for this contract. Trees can be burned if they follow IDOT and EPA policy. IDOT's 2022 Open Burn Permit should be consulted for the necessary requirements and conditions for burning trees. Please continue to monitor the website for an upload of the Open Burn Permit to an additional information folder. (11/09/2022)

  • Who do I contact to become approved for bidding as currently not prequalified?
    To perform the major item of work on a contract, the prequalification cutoff was 10/28/2022. For future reference, the link for contacting about prequalification for a major work item is https://idot.illinois.gov/doing-business/procurements/construction-services/index. Also, at the bottom of your authorization to bid report, there is contact information for the Bureau of Construction's authorization to bid area. (11/03/2022)

  • Plans and Special Provisions state Removal to be done between April 1 and September of any year. Completion date is March 31 2023?
    Correct. The completion date is March 31, 2023. The commitment note is to allow the Contractor to note that trees shall only be cut from October 1 to March 31, with no exceptions. The Contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (10/25/2022)

Authorized Bidders

  • 2661 Homer Tree Service, Inc.
    16464 W. 143rd Street
    Lockport, IL 60441
    Phone: No Record Fax: No Record Email: No Record
    $419,610.20

  • 1675 Endrizzi Contracting, Inc
    965 Corzine Road
    Buncombe, IL 62912
    Phone: No Record Fax: No Record Email: No Record
    $680,643.00

  • 1908 Freesen, a div of UCM, Inc.
    3151 Robbins Road
    Springfield, IL 62704
    PO Box 13420
    Springfield, IL 62791
    Phone: No Record Fax: No Record Email: No Record

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 276.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 253.000
20100500 ACRE TREE REMOVAL, ACRES Base items 7.500
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 1,182.000
28000315 TON AGGREGATE DITCH CHECKS Base items 120.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 3,290.000
28000500 EACH INLET AND PIPE PROTECTION Base items 9.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
X6650202 FOOT WOVEN WIRE FENCE REMOVAL Base items 4,584.000
No More Pay Items